110
Construction of the artificial port
The Omaha Beach dam was called "Gooseberry 2"
(The Utah Beach blockship dam was called "Gooseberry 1" )
The artificial port with floating docks and walkways at Omaha Beach was called "Mulberry A"
(Arromanches was the "Mulberry B")

(details)
The Port Project (13 May 44)




110
Construction of the port began on 7 June 1944.
The following chapters recall the implementations:
floating breakwaters "Bombardons" (page 111)
reinforced concrete casings "Phoenix" (page 112)
sunk ships in the form of blockships "Corncobs" (page 113)
auto-lifting floating docks "Lobnitz" (page 114)
floating bridges "Whale" (page 115)
carriageways made of assembled boxes "Causeways" (page 116)