(details) The "Beetle" floats(details) A bridge train across the Channel. Set-up winches are stored on decks.(details)
A bridge element in the process of installation
(details)(details) A failed bridge near the storm(details) Around June 17th the walkways "Whale" in front of the ruins of the villa Mary(details) The primers of the 3 gateways
(details) A trailer bridge sectionOn the right a bridge element(details) The 3 bridge primers, the 1st is at the foot of the descent of Vierville (ca. 18 June)(details) Trailer dragging Whale Bridges