The 121st Engineer Battalion operational report

AAR 121ECB

1- Summary of operations

a- Landing and assault of the beach

The 121 ECB minus the AEC, plus the attached 112 ECB, landed on OB as part of the 116RCT.

The 1eras units of this Bat to be approached were 2 sections of Cie B, with Colonel Ploger (lead of the battalion) and a small staff, transported by 2 LCM scheduled at 7:10am on June 6, (arrived in fact at 7:40am on the Dog White - Dog Red boundary). These sections were quickly followed by a LCM carrying 1 section of Cie B and 1 section of Cie C at 7:20 a.m. The forward elements of Battalion HQ landed from an LCI (LCI 91?) at 7:30 a.m.

Landings were carried out under heavy artillery and machine guns, especially since no infantry were present on Dog Green and part of Dog White.

A direct gunshot hit the front of the LCI at the beginning of the landing and many sappers were killed or injured by the subsequent explosion and fire.

It is estimated that 50% of the initial forces were lost, as well as 75% of the equipment. Cape Town. Holmstrup, Cdr Cie was killed leaving his LCM.

The first efforts were to pool our forces and gather enough material on the beach to accomplish our missions.

Some elements of the battalion immediately advanced into the interior and entered Vierville at around 10:00, across fields, by the cliff overlooking the beach east of Vierville.

Two sections of Cie C landed on Easy Green from LCT (at least 2 LCT) at 10.30 a.m., with bulldozers and 1 ton of explosives each.

The remains of the B and C companies were then directed to D1 to open the exit to traffic. It was necessary to sweep several snipers' positions before effective work could begin.
Approximately 30 prisoners were taken in so doing.

At approximately 12:00 p.m. an Officer patrol, led by Gal Cota and comprising Major Olson (Cdr. 29DI Engineer) Cape Bainbridge (Assistant ADE 254ECB, Lt MacAllister (Assistant 121ECB) and others descended from Vierville by descent D1 before it was opened and joined the elements of the Battalion at work to open the beach road to Vierville. (They brought with them five prisoners made on the way down). Col Ploger's PC was on Dog White, 150m from the waterfront.
The D1 closing wall was exploded with an external load of 500kg TNT. The resulting 4m wide broach was sufficient for tanks and racked equipment.

La Cie B stayed on the beach to complete the opening of the road to Vierville. This was accomplished by 9:00 p.m.

Meanwhile the Cie C was responsible for cleaning the "Transit Area 1", west of Vierville, which was achieved at 50% that night. Cie C bivouaqué in the "Transit Area 1", the HQ and S (QG and Services) and B cies bivouaqué 500 m south of Vierville.

At 5:30 a.m. on June 7, the enemy attacked our positions in the South. They were caught in deadly fire and sustained heavy losses, including prisoners. The battalion elements resisted until the arrival of Rangers supported by tanks at about 10.30 a.m.

We then installed a defence position for the 29DI CP (located in the quarry of the Vierville-D1 route) along the E-O road crossing Vierville.
Captain Humphrey Cdd B Cie was wounded by moving B Cie from the assembly area.
The battalion's PC moved 800m west of Vierville to

At 4:00 p.m., Cie C continued her work at Transit Area 1, which was ready for 7:00 p.m. on June 7.

Cie A landed attached to 115RCT (at the Ruquet), with its leading element arriving at 23:00 on June 6. By crossing St-Laurent (on the morning of June 7?), the company fell under the fire of snipers, Captain Martin, his CO, was wounded and evacuated. Cie A joined the battalion on the evening of June 7 in Vierville.

Original website reference: 2624-CR121ENG.html. About the collection and its continuation.

Quick access to the collection

Find a document

Search document titles and texts.

All results →

Escape to close · The full search remains available without JavaScript.

The documentary collection
Enlarged document